Roof replacement in Fairfax, VA,
most done in one day.
Full tear-off, never shingles over shingles. Our own crew, out of our Main Street office, with the HOA packet and the permit question handled before the dump trailer shows up. New roofs from $79/mo with 0% financing.
What happens before the first bundle goes up.
A Fairfax replacement has three things to sort out ahead of install day: the HOA, the permit question, and where the trailer parks. We handle all three from the Main Street office so the crew can start at seven and be sweeping nails by dinner.
HOA color approval
Most Fairfax subdivisions have an architectural review step for roof color, and some keep an approved shingle list. We give you the spec sheet and a physical color sample for the packet and build to whatever the board signs off on, so approval doesn't push your install date.
Do I need a permit?
For a like-for-like shingle replacement, Fairfax County generally doesn't require a building permit unless a large area of roof decking is replaced or the roof is fire-rated, which is common on townhouses. We tell you which applies to your home before work starts and pull the permit when one is needed.
The driveway and the trees
The dump trailer needs your driveway for the day, so cars go on the street the night before. We tarp the beds and the AC unit, and on the tree-heavy lots around Fairfax we check limb clearance first, because a low oak branch is what turns a one-day roof into two.
Every Fairfax replacement includes
Every LCR replacement includes
- ·Full tear-off, never shingles over shingles
- ·Decking inspection, rot replaced before covering
- ·Ice & water shield at eaves and valleys
- ·New underlayment, drip edge & ridge venting
- ·Magnetic nail sweep + full site cleanup, daily
- ·Warranty registered in your name, up to 50 years
What moves your number
Pitch, how many old layers come off, the decking underneath, and the shingle grade you choose. On the 1970s and '80s colonials around Fairfax we often find a second layer and a few soft sheets of decking, so the free inspection pins all of it down in writing before you sign. After your deposit, there's no more payment until the job is done and you're satisfied.
Fairfax replacement questions, answered.
How long does a Fairfax roof replacement take?
Most single-family roofs in Fairfax are torn off and finished in one day. Steep pitches, a second layer, or a lot of decking repair can push it to two. We tell you which before we start, and the crew that quoted it is the crew on the roof.
Do I have to be home?
No. We need the driveway clear and the pets inside, and we'll text you when we start and when we finish. Plenty of Fairfax homeowners leave for work and come back to a new roof and a swept driveway.
Can I finance it?
Yes. 0% interest for up to 24 months, with new roofs from $79/mo. See financing options, or ask on the inspection and we'll run the numbers with you.
The full picture, one click away.

Think it's time for a new roof? Let's find out, free.
If it's really a repair, we'll say so. If it's a replacement, you get an itemized quote, the HOA packet, and an install date from the Main Street office. No pressure, no obligation.